The Galena Territory AssocationPhoto
brown bar

Association Info

Programs/Forms

Building Application

Email:
Prior to building your home in the Galena Territory, or adding additional exterior features such as a deck, shed or garage, you must submit your plans to the Architectural Review Committee for approval. They will work with you to make the process as easy as possible.

All fields on this form are required.

You must Print this page, Sign, and Mail to the Architectural Review Committee.

Using the Submit Button does not submit a legal and official document. Thank-you

* Owner:
* Address:
* City:
* State & Zip:
* Phone:
* Territory Lot #:
* Territory Subdivision Unit:
* Territory Address:

* Contractor:
* Address:
* City:
* State & Zip:
* Phone:

* Architect:
* Address:
* City:
* State & Zip:
* Phone:

THIS APPLICATION IS FOR APPROVAL OF: (See the attached fee schedule for required fees to be submitted. All checks must be made out to: THE GALENA TERRITORY ASSOCIATION, INC.)

* Prelimiary Conceptual Design:
* New Construction:
* Addition or Exterior Alteration:
* Satellite Dish:
* Building Type:
Custom Home Garage Screened Porch
Modular Home Stable/Corral Rooms
Panelized Home House Deck Shed
Other
This application is for enclosing or alterations on: (No Building Service Fee required for the following) :
LP Tank & Screening Screening in existing deck Interior Changes
* This application is for color change approval of::
House Garage Other
Roofing (Present Colors):
Roofing (Proposed Colors & Brand):
Exterior Siding (Present Colors):
Exterior Siding (Proposed Colors & Brand):
Garage Door (Present Colors):
Garage Door (Proposed Color & Brand):
Trim (Present Color):
Trim (Proposed Color & Brand):
Front Door (Present Color):
Front Door (Proposed Color & Brand):
Other Entry Doors (Present Colors):
Other Entry Doors (Proposed Color & Brand):
Window Color (Present Color):
Window Color (Proposed Brand & Color):
The Arbitration Clause

Any controversy or claim arising out of or relating to the Architectural Review Committee process or the application of the Architectural Guidelines and Review Procedures for the Galena Territory shall be settled by arbitration in accordance with the Arbitration Rules and Procedures set forth in the Architectural Guidelines and Review Procedures, and judgement upon the award rendered by the arbitrator may be entered in any court having jurisdiction thereof.

* General Contractor:
* Owner Signature & Date:
All fields on this form are required.

You must Print this page, Sign, and Mail to the Architectural Review Committee.

Using the Submit Button does not submit a legal and official document. Thank-you


 

 

 

| Click here to view this months Territory Times Ads





2000 Territory Drive / Galena, Illinois / 61036 PH (815) 777-2000 / FX (815) 777-9194
BACK TO TOP